Building work plate construction site
Building work plate construction site
Unit Price: | 196.32~200.21 USD |
---|---|
Payment Type: | T/T,L/C |
Incoterm: | FOB |
Min. Order: | 100 Square Meter |
Delivery Time: | 20 Days |
Packaging: | 50-100pcs Per Bulk/ With Steel Plate/ Customized Package |
---|---|
Productivity: | 50,000 square meter per month |
Brand: | SX |
Transportation: | Ocean,Land,Air |
Place of Origin: | China |
Supply Ability: | 50,000 square meter per month |
Certificate: | CE;SGS;BV;ISO9001 |
Basic Info
Model No.: H11075
Product Description
Building work plate construction site
Product Description
1. Construction cycle is short, high efficiency : Aluminum formwork system for the fast form removal system, generally 18-36 hours to form removal, so only one layer of aluminum templates plus three single support can be used, a layer of the normal construction of up to 3-4 days, thus greatly shorten the construction period, the construction units to save administrative costs, as well as real estate developers to shorten the development cycle .
2. Reusable Low cost : Regulate the construction of a template can be flipped 300 times or more, use of low cost
3. Easy construction, high efficiency : Aluminum formwork system assembly is simple, convenient installation, simply pro rata increase the standard board, light weight aluminum template per square meter 18-25KG. Construction process is completely assembled by hand, transshipment; does not depend Lifting Equipment
4. Good stability, high capacity: capacity up to 60KN
5. Wide range of applications : Aluminum formwork system is suitable for all building components, such as load-bearing walls, columns, beams, stairs, balconies, etc., are available through the cement pouring at once .
Aluminum Formwork VS Timber Formwork
NO. | Reference | Aluminum Formwrk | Timber Formwork |
1 | Material cost (Included Support) | 3-216/m2 | --16/m2 |
2 | Turnarond times | 200times at least | 3-5times |
3 | assembling and dismantling labor cost | .6-4.2/m2 | .2-4.7/m2 |
4 | recovery value | /m2 | .8/m2 |
5 | subtotal arifical materials | .4-4.9/m2 | .5-8/m2 |
6 | leveling the wall plastering labor cost | .4/m2 | /m2 |
7 | leveling the wall plastering material cost | .3/m2 | .6/m2 |
8 | ergonomics | 20m2/day | 15m2/day |
9 | final ecomic indicators | .9-6.4/m2 | -13/m2 |
Remarks:
1. It will be different ,due to its different price of commodities and cost of labor in the locality .
2.Aluminum Formwork System contains all supporting, waling,release agent etc which must be used under construction
| |
Introduction of Building work plate construction site
1. Prop of Hardware columns aluminum shuttering site
{tag}
Welcome to our factory!
{tag}
{tag}
Contact us if you need more details on Building Work Plate Construction Site. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Building Work Plate Construction Site、Aluminum Shuttering Site. If these products fail to match your need, please contact us and we would like to provide relevant information.
Product Categories : Aluminium Formwork Systems
Premium Related Products
Other Products
Hot Products
Surpermarket Temporary fence meshCoated wire mesh fence wallCanada fence construction meshCrowd control metal barrierPVC coated 3D panel fencingSupply double wire panelsISO green 358 Anti-clomb fence for gardenchain link wire netpowder coated green 4/1530mm garden fenceISO 9001 Iron 358 Anti-climb fencing358 welded fence / welding fencingdiamond mesh fence wire fencingGreen coated welded security high fencinghot sale 868 high security fenceOlympics metal Barricade fenceconstruction mandate weld wire fence