Find Aluminium Formwork System, Aluminium Formwork, Metal Formwork Systems on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Inquiry Basket (0)
Building work plate construction site
Home > Products > Aluminium Formwork Systems > Building work plate construction site

Building work plate construction site

    Unit Price: 196.32~200.21 USD
    Payment Type: T/T,L/C
    Incoterm: FOB
    Min. Order: 100 Square Meter
    Delivery Time: 20 Days
    Packaging: 50-100pcs Per Bulk/ With Steel Plate/ Customized Package
    Productivity: 50,000 square meter per month
    Brand: SX
    Transportation: Ocean,Land,Air
    Place of Origin: China
    Supply Ability: 50,000 square meter per month
    Certificate: CE;SGS;BV;ISO9001

Basic Info

Model No.: H11075

Product Description


Building work plate construction site








Product Description


1. Construction cycle is short, high efficiency : Aluminum formwork system for the fast form removal system, generally 18-36 hours to form removal, so only one layer of aluminum templates plus three single support can be used, a layer of the normal construction of up to 3-4 days, thus greatly shorten the construction period, the construction units to save administrative costs, as well as real estate developers to shorten the development cycle .


2. Reusable Low cost : Regulate the construction of a template can be flipped 300 times or more, use of low cost


3. Easy construction, high efficiency : Aluminum formwork system assembly is simple, convenient installation, simply pro rata increase the standard board, light weight aluminum template per square meter 18-25KG. Construction process is completely assembled by hand, transshipment; does not depend Lifting Equipment


4. Good stability, high capacity: capacity up to 60KN


5. Wide range of applications : Aluminum formwork system is suitable for all building components, such as load-bearing walls, columns, beams, stairs, balconies, etc., are available through the cement pouring at once .


Aluminum Formwork VS Timber Formwork

NO. Reference Aluminum Formwrk

Timber

Formwork

1 Material cost (Included Support) 3-216/m2 --16/m2
2 Turnarond times 200times at least 3-5times
3 assembling and dismantling labor cost .6-4.2/m2 .2-4.7/m2
4 recovery value /m2 .8/m2
5 subtotal arifical materials .4-4.9/m2 .5-8/m2
6 leveling the wall plastering labor cost
.4/m2
/m2
7 leveling the wall plastering material cost .3/m2 .6/m2
8 ergonomics 20m2/day 15m2/day
9 final ecomic indicators .9-6.4/m2 -13/m2




Remarks:


1. It will be different ,due to its different price of commodities and cost of labor in the locality .


2.Aluminum Formwork System contains all supporting, waling,release agent etc which must be used under construction








Introduction of Building work plate construction site








1. Prop of Hardware columns aluminum shuttering site
























{tag}


Welcome to our factory!


{tag}


{tag}

Contact us if you need more details on Building Work Plate Construction Site. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Building Work Plate Construction Site、Aluminum Shuttering Site. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : Aluminium Formwork Systems